G5 July through September 2024 Maintenance & Repairs

July Works Carried Out:

  • Carpets steam cleaned, boat detailed

  • Defect list for G5 Gast for crew quarters 

  • Detail or hatches and under hatch lids 

  • Check Generator for oil leaks - - loose oil filter was tightened

  • Detail crew quarters and Bathroom Clint. 

  • Latch replaced for outdoor garbage bin Simco retake deck. 

  • Fixture for stereo so lots of letters properly 

  • New latch on bar fridge in Living Room. 

  • Detail all internal vinyl with micro fibre sponge. 

  • Floor board repaired, needs acetone

  • Ray Marine support brackets  - needs better option

  • Adjust doorhandles on drawers 

  • Line address fridge doors and hinges. 

  •  Put door back on rear of switchboard.

  • Trim tabs connect and tidy wiring.

  • Full detail JetSki garage 


Aug & September Works Carried Out:

  • Changed batteries, 2 x engine + 1 x generator

  • Clean oil in engine room



Click here for full sheet

Click here for images - August

Click here for videos - September



As discussed with Andrew T on July 16, 2024

  • Defect list for G5 Gast for crew quarters 

  • Detail or hatches and under hatch lids 

  • Paint timber table top Engine room. 

  • Check Generator for oil leaks.

  • Detail crew quarters and Bathroom Clint. 

  • Clean crew quarters floor and check for leaks. yeah, I tried when it were open every day. I want to get this cover. 

  • Keep cover on rear table at all times. 

  • Latch replaced for outdoor garbage bin Simco retake deck. 

  • Fixture for stereo so lots of letters properly 

  • New latch on bar fridge in Living Room. 

  • Detail all internal vinyl with micro fibre sponge. 

  • Glue flooring at top of stair riser and loose floorboard. 

  • Ray Marine support brackets 

  • Service side door and check operations

  • New gear for roof

  • Make sure Starlink is not turned on. 

  • The account is deactivated. 

  • Retrim cushions to match the new front cushions. Also get recover to protect re-deck and cushions just having 

  •  Coffee mugs tidy all drawers and covers throughout. 

  • Adjust doorhandles on drawers 

  • Line address fridge doors and hinges. 

  • Tidy door handle in master master.

  •  Put door back on rear of switchboard.

  •  Check silicon on sunroof glass panels for water leaks. Order front cushions. 

  • Adjust winch counter. 

  • Trim tabs connect and tidy wiring.

  • Fix fix hatch lid on glovebox mate 

  • Fix outboard motor

Next
Next

G5 Feb - June 24 Maintenance & Repairs